top of page

Ground-mounted photovoltaic modules supported by structural mounting systems

FRP Solar Frame Ready to ship profiles

FRP / GRP solar mounting system supplied across a major renewable energy development, with phased international logistics coordinated by Reinforce Technology Group.

18,500+

Structural Components Supplied

9KM+

Mounting Rails Supplied

12MW+

Solar Farm Capacity

2

Phased shipment arrived on Schedule

THE CHALLENGE

A renewable energy developer required a durable mounting structure for a ground-mounted photovoltaic installation in a high-humidity environment. The system needed to provide reliable structural support for solar modules while withstanding long-term exposure to rain, humidity, and UV radiation.

Traditional steel mounting systems presented concerns related to heavy weight, corrosion, maintenance requirements, and lifecycle cost, particularly in tropical climates where environmental exposure can accelerate material degradation.

The project required a structural solution that could deliver long service life, low maintenance, and efficient installation while supporting the performance of the solar infrastructure.

THE SOLUTION

Reinforce Tech supplied a pultruded FRP solar mounting system designed for large-scale photovoltaic installations.

FRP composite materials provide excellent corrosion resistance, lightweight structural performance, and durability in demanding outdoor environments. The modular mounting structure allows for efficient installation and long-term structural stability for solar modules.

FRP / GRP  provided a structurally equivalent solution with a fraction of the embodied carbon, a 30+ year design life, and zero toxic maintenance processes making it the only material specification that genuinely aligned with the sustainability objectives of the development.

FRP Solar frame installation in field

THE RESULT

All delivery phases were completed on schedule, maintaining installation momentum across the site programme. Product has been successfully received and is staged for installation as construction advances through subsequent build phases.

By specifying FRP / GRP over steel, the developer has eliminated an estimated 50+ years of recoating cycles, chemical treatment and premature replacement from the asset's maintenance programme — delivering infrastructure that genuinely reflects the sustainability ambitions of the wider development.

bottom of page